Infrastructure

The scale of development proposed in Docklands will require significant investment in infrastructure. A detailed Infrastructure Strategy has been prepared as part of the South Docks Local Area Plan process. This Strategy outlines objectives and strategies to guide the development of the physical infrastructure for the area. The following topics outline the key elements of Docklands Infrastructure currently being addressed:

  1. Eastern Gateway Bridge Water Street Bridge and Spine Route Network
  2. SEVESO Sites
  3. Land Contamination Study
  4. Quay Walls
  5. OPW Lee Catchment Flood Risk Assessment and Management Study
  6. Water Supply Study 
  7. District Heating Feasibility Study
  8. Draft Digital Buildings Telecom Access Guidelines for Cork Docklands

Studies have been undertaken on a number of these areas and these will be made available upon completion. Please use the attached links to view the most up-to-date data available on each topic.